Support our Railway – Broom Lane Bridge Appeal!

IMG_6594

WE STILL NEED YOUR SUPPORT WITH OUR MOST SIGNIFICANT  PROJECT TO DATE!

Broom Lane 2026 Leaflet

We had to replace the old Broom Lane Bridge between High Rocks and Groombridge. We completed this between 22nd February and 18th April; however, we’re still paying off the cost of this enormous project over the next two years, and we need your help!

As of September 2026, we have raised over £130,000! 

The original Broom Lane Bridge was built in the 1890s and was rapidly approaching the end of its life.

To keep you moving along the Spa Valley Railway, we regularly inspected the original bridge, imposed a speed restriction, and subjected it to enhanced monitoring. We also load-tested it to demonstrate its continued availability for rail traffic.

However, we had to take action before the corrosion reached a point where trains could no longer operate.

Therefore, between February 22nd and April 18th, we replaced Broom Lane Bridge with the great help and support of Beaver Bridges, who designed, built, and installed the bridge, and Stewart Robinson, Managing Director of Sonic Rail Services, who replaced the track across the structure as a very kind gesture to our railway.

If we hadn’t replaced the bridge, taking a train from Tunbridge Wells west to Groombridge and Eridge would no longer be possible.

DONATE NOW!

There were different phases to replace Broom Lane :

  • Phase 1, a certified replacement bridge design, cost us over £30,000. Thanks to our savings, we engaged Beaver Bridges, which specialises in bridge design, construction, and installation. This was completed by August 2025.
  • Phase 2 involved constructing and painting a new bridge, which cost over £150,000. This was completed in January 2026.
  • Phase 3 involved removing the old bridge and installing the new one, along with associated brick and track works, costing over £450,000. This took place between Sunday, 22nd February and Saturday, 18th April 2026.
  • Phase 4 is to continue paying off this huge investment until 2028. Please consider donating to our appeal, which remains ongoing despite the bridge’s replacement.

Broom Lane 2026 Leaflet

DONATE NOW!
WhatsApp Image 2026-04-15 at 18.53.22 (2)

We need your support; please donate via our JustGiving page!

We can’t pay this off without your ongoing support, and we are appealing to anyone who can help us repay this investment by 2028.

We know a bridge isn’t glamorous, but without it, we would have been unable to run trains over the entire length of our railway. We would be extremely grateful for any donations to our appeal or for participation in our fundraising activities.

Help keep the Spa Valley Railway in Tunbridge Wells operating for future generations.

Broom Lane 2026 Leaflet

DONATE NOW!

How else can I donate, and can I Gift Aid my donation?

You can also donate directly via BACS transfer to the following account:

  • Tunbridge Wells Eridge Railway
  • 85689874
  • 55-70-13

If you are unable to donate online or via BACS Bank Transfer, you can send a cheque made payable to the T.W.E.&.R.P.S. to the following address:

  • Broom Lane Bridge Appeal
, West Station, Nevill Terrace
, Tunbridge Wells
, Kent, TN25QY


YOU MUST MAKE IT PAYABLE TO “T.W.E.&.R.P.S.” AS THE BANK WILL NOT ACCEPT ANYTHING ELSE ON A CHEQUE.

You can also Gift Aid your donation. Please download the form below, fill it in and email it to [email protected].

Every £1 you donate gives us an extra 25p! That means that if you donated £100, we would actually get £125!

Click here for the latest updates on the bridge replacement!

Gift Aid Form
Support Our Railway

BUY A BEER FOR BROOM LANE!

When you travel on our trains, why not buy a beer for Broom Lane and support the bridge for just £5! Every pound spent goes straight to the appeal.

Broom Lane 2026 Leaflet

DONATE NOW!

Thank you to Sonic Rail Services!

The Spa Valley Railway wishes to extend an enormous and heartfelt thank you to Stewart Robinson, the Managing Director of Sonic Rail Services.

Sonic Rail Services have very kindly gifted the Spa Valley Railway the recent track work, materials, and labour costs for the track they replaced at Broom Lane Bridge. The machines, track, and material costs total approximately £60,000; this enormous saving and generosity cannot be underestimated, and we are truly taken aback by his and Alex Robinson’s kindness.

This gift also extends to the Volker Rail tamper, which Stewart arranged through SRS. The cost savings for this and the work it did are worth thousands of pounds, slotting into the tampers’ extremely busy mainline schedule.

Stewart is a preservationist through and through, always available on the phone and someone to call upon for anything infrastructure- or railway-related.

We are sure our followers will join us in passing an enormous thank you to Sonic Rail Services, and long may our relationship with them continue.

Thank you, Stewart. We are truly grateful!

Broom Lane 2026 Leaflet

Sonic Rail Services